China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng


Product Details

OVERVIEW

RELATED PRODUCT

Related Video

Feedback (2)

"Control the standard by the details, show the power by quality". Our organization has strived to establish a highly efficient and stable employees team and explored an effective high-quality command method for Injection Plastic Moulds, Heat Sink Die Casting Parts, Aluminum Truck Parts, We honor our core principal of Honesty in business, priority in company and will do our greatest to provide our customers with high-quality goods and fantastic provider.
China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng Detail:

Before Mould-Making:

After having the design 3D drawings, we will make a thorough analysis to evaluate its mould-making method based on your requirements, to find if the design needs any improvement for better production to avoid shrinkage/undercut/etc problems.

The following information is requested before mould-making:

1. Parts Design Drawing, better in 3D drawing, if not, 1pcs sample is acceptable;

2. Specified plastic material, or we can suggest the suitable material after knowing its usage conditions.

3. Estimate Production quantities

Mould-Making Process:

1-Mould-DFM-Analysis

1. Mould DFM Analysis

2--Mould-Design

2. Mould Design

3-Mould-Material-Preparation

3. Mould Material Preparation

4-CNC-machining

4. CNC machining

5-EDM-Machining

5. EDM Machining

6-Grinding&Drilling-Machining

6. Grinding&Drilling Machining

7-wire-EDM-maching

7. wire EDM maching

8-mould-aftet-treatment

8. mould aftet treatment

9-Mould-Assembly

9. Mould Assembly

After mould is finished:

1-Mould-trial

1. Mould trial

2-Sample-Approval

2. Sample Approval

3-Injection-Production

3. Injection Production

4-Prodcuts-Inspection

4. Prodcuts Inspection

5-Ready-for-Shipment

5. Ready for Shipment

6-Mould-Storage&Maintenance

6. Mould Storage&Maintenance

FAQ

1, Q: How do I know if injection molding is the suitable and right process for my product?
   A: The part’s geometry, the quantity need, project budget and the application the part is being used for are the factors to decide this.

2, Q:  How long does it take to make an injection mold?
    A: 4-8 weeks on average, depending on the mold’s complexity and size.

3, Q: Do you offer short or long production runs?
    A: We offer both high and low volume production runs for customized products at any scale.

4, Q: Who own the mold?
    A: Who pay the mold price who has the right to own it. As a supplier, we will help to store and maintain the finished mold safe until its shoting life comes to the end.

5,Q: How should I get started?
   A: Just send us your files, we accept a variety of CAD formats and can even start to work from sketches, models or pre-existing parts.
To learn more about our services or how you can get started on your own project, contact our team today.


Product detail pictures:

China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng detail pictures

China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng detail pictures

China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng detail pictures

China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng detail pictures

China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng detail pictures


Related Product Guide:

We are ready to share our knowledge of marketing worldwide and recommend you suitable products at most aggressive costs. So Profi Tools offer you finest benefit of money and we are ready to produce alongside one another with China Manufacturer for Die Casting For Machine Parts - Injection Plastic Mould Case – Ruicheng , The product will supply to all over the world, such as: Bahamas, Czech republic, Canberra, We warmly welcome domestic and overseas customers to visit our company and have business talk. Our company always insists on the principle of "good quality, reasonable price, the first-class service". We are willing to build long-term, friendly and mutually beneficial cooperation with you.
This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
5 Stars By Audrey from Juventus - 2017.08.21 14:13
The factory can meet continuously developing economic and market needs, so that their products are widely recognized and trusted, and that's why we chose this company.
5 Stars By Candance from Montreal - 2017.09.29 11:19