OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng


Product Details

OVERVIEW

RELATED PRODUCT

Related Video

Feedback (2)

Sticking for the perception of "Creating goods of high quality and making good friends with people today from all around the world", we constantly set the interest of shoppers to begin with for Moulding, Alloy Die Casting For Mould, Oem Aluminum Die Casting, We fully welcome shoppers from all around the world to ascertain stable and mutually effective enterprise interactions, to have a dazzling long run jointly.
OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng Detail:

Before Mould-Making:

After having the design 3D drawings, we will make a thorough analysis to evaluate its mould-making method based on your requirements, to find if the design needs any improvement for better production to avoid shrinkage/undercut/etc problems.

The following information is requested before mould-making:

1. Parts Design Drawing, better in 3D drawing, if not, 1pcs sample is acceptable;

2. Specified plastic material, or we can suggest the suitable material after knowing its usage conditions.

3. Estimate Production quantities

Mould-Making Process:

1-Mould-DFM-Analysis

1. Mould DFM Analysis

2--Mould-Design

2. Mould Design

3-Mould-Material-Preparation

3. Mould Material Preparation

4-CNC-machining

4. CNC machining

5-EDM-Machining

5. EDM Machining

6-Grinding&Drilling-Machining

6. Grinding&Drilling Machining

7-wire-EDM-maching

7. wire EDM maching

8-mould-aftet-treatment

8. mould aftet treatment

9-Mould-Assembly

9. Mould Assembly

After mould is finished:

1-Mould-trial

1. Mould trial

2-Sample-Approval

2. Sample Approval

3-Injection-Production

3. Injection Production

4-Prodcuts-Inspection

4. Prodcuts Inspection

5-Ready-for-Shipment

5. Ready for Shipment

6-Mould-Storage&Maintenance

6. Mould Storage&Maintenance

FAQ

1, Q: How do I know if injection molding is the suitable and right process for my product?
   A: The part’s geometry, the quantity need, project budget and the application the part is being used for are the factors to decide this.

2, Q:  How long does it take to make an injection mold?
    A: 4-8 weeks on average, depending on the mold’s complexity and size.

3, Q: Do you offer short or long production runs?
    A: We offer both high and low volume production runs for customized products at any scale.

4, Q: Who own the mold?
    A: Who pay the mold price who has the right to own it. As a supplier, we will help to store and maintain the finished mold safe until its shoting life comes to the end.

5,Q: How should I get started?
   A: Just send us your files, we accept a variety of CAD formats and can even start to work from sketches, models or pre-existing parts.
To learn more about our services or how you can get started on your own project, contact our team today.


Product detail pictures:

OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng detail pictures

OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng detail pictures

OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng detail pictures

OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng detail pictures

OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng detail pictures


Related Product Guide:

Assume full duty to satisfy all demands of our clients; reach steady advancements by marketing the development of our purchasers; grow to be the final permanent cooperative partner of clientele and maximize the interests of customers for OEM Factory for Auto Part Mould - Injection Plastic Mould Case – Ruicheng , The product will supply to all over the world, such as: Saudi Arabia, Turkey, Korea, We critically promise that we deliver all the customers with the best quality solutions, the most competitive prices and the most prompt delivery. We hope to win a resplendent future for customers and ourselves.
The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
5 Stars By Pamela from Doha - 2017.02.18 15:54
Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
5 Stars By Gary from United Kingdom - 2018.09.16 11:31